Tuesday 19 November 2013

Full Steam Ahead.

Jose and his team are making great progress. 

The bathroom is starting to take shape with a sink unit and shower walls being built. We also block an oddly positioned corridor, adjacent to the bathroom, in order to make a space for the hot water tank; it also presents a void in which to house a built-in wardrobe for the 2nd bedroom.

Shower walls and sink unit built.

Bricking up an oddly placed corridor.

The doors and windows don't take long to arrive either, making the property water tight and hopefully free from certain creatures!


Making La Casita water tight. 
From the inside 


The new glass front door, allowing as much light as possible
into the house.



They even make a start on laying the ceramic floor tiles both inside and on the terrace and entrance path.


Floor tiles

Entrance

No comments:

Post a Comment

What do you think?