Jose and his team are making great progress.
The bathroom is starting to take shape with a sink unit and shower walls being built. We also block an oddly positioned corridor, adjacent to the bathroom, in order to make a space for the hot water tank; it also presents a void in which to house a built-in wardrobe for the 2nd bedroom.
|
Shower walls and sink unit built. |
|
Bricking up an oddly placed corridor. |
The doors and windows don't take long to arrive either, making the property water tight and hopefully free from certain creatures!
|
Making La Casita water tight. |
|
From the inside |
|
The new glass front door, allowing as much light as possible into the house.
|
They even make a start on laying the ceramic floor tiles both inside and on the terrace and entrance path.
|
Floor tiles |
|
Entrance
|
No comments:
Post a Comment
What do you think?